AmpereHour Energy Launches Intelligent Energy Storage Manufacturing Platform, Bringing Digital-First BESS Integration to India
Built on real-world project learnings, AmpereHour brings together containerized BESS integration, ELINA EMS intelligence and AH-Suite Digital FAT to build safer, smarter and future-ready energy storage assets
Pune: AmpereHour Energy, a leading full-stack Battery Energy Storage System (BESS) solutions provider, today announced the inauguration of its new BESS Manufacturing and Integration Facility in Chakan, Pune. The facility will focus on the integration of Make in India cabinet and containerized Battery DC-AC Blocks for utility-scale and commercial & industrial applications.
The platform combines AmpereHour’s expertise in hardware-agnostic architecture, proprietary Energy Management Systems (EMS), subsystem engineering, and advanced safety design with AH-Suite: AmpereHour’s digital factory quality management and product testing platform (AH Factory Suite), enabling complete traceability, performance validation, and a faster transition from factory to field.
Built on years of experience deploying complex BESS projects, AmpereHour’s transition into manufacturing has been driven by customer needs and real-world project learnings around system performance, safety, reliability and lifecycle management.
Commenting on the launch Mr. Rahul Shelke, Co-founder & Managing Director, AmpereHour Energy said, “Energy storage is becoming the backbone of the future grid, and India has an opportunity to lead not just in scale, but through technology-led innovation. Our expansion into advanced BESS manufacturing is built on years of experience as system integrators — understanding what makes storage assets safer, smarter and more reliable in real operating environments. With our Make in India DC Block platform and digital infrastructure like AH-Suite, we are building more than products; we are building long-term energy resilience.”
The facility marks AmpereHour’s evolution from a BESS technology integrator to an advanced manufacturing platform focused on building intelligent, digitally validated energy storage systems for India and global markets. With a planned capacity of 5 GWh, it represents a strategic investment towards strengthening India’s energy storage ecosystem through localized integration, deeper engineering capabilities and digital innovation.
Powered by AmpereHour’s proprietary ELINA Energy Management System, these deployments have strengthened its expertise in renewable integration, peak management, grid flexibility and long-term asset performance.
“For us, manufacturing was a natural progression of our journey as a BESS technology integrator. Energy storage is not just about assembling batteries; it is about engineering intelligent assets that deliver reliable performance throughout their lifecycle. AH-Suite brings our field learnings into manufacturing by ensuring every system is digitally validated before it reaches site.” said Mr. Ayush Misra, Co-founder & CEO, AmpereHour Energy
These learnings now form the foundation of AmpereHour’s manufacturing approach — integrating engineering intelligence, software and digital validation directly into its BESS platforms.

Comments are closed.